Team:INSA Toulouse/contenu/lab practice/notebook/calendar/general inducer
From 2013.igem.org
(Difference between revisions)
Mesnageclem (Talk | contribs) |
|||
(3 intermediate revisions not shown) | |||
Line 90: | Line 90: | ||
{ | { | ||
color: #5a6060;} | color: #5a6060;} | ||
+ | |||
+ | h2.faq { | ||
+ | display:list-item; | ||
+ | list-style-image : url(https://static.igem.org/mediawiki/2013/8/84/Insa-toulouse2013-listpuce1.png); | ||
+ | width:auto; | ||
+ | height:27px; | ||
+ | line-height:24px; | ||
+ | background: no-repeat; | ||
+ | border:none; | ||
+ | color:#5a6060; | ||
+ | padding:3px 0 0 0; | ||
+ | font-weight:400; | ||
+ | font-family:'Open Sans'; | ||
+ | margin:0 0 50px 0; | ||
+ | font-size:14px; | ||
+ | } | ||
+ | |||
+ | .infos {width:680px; margin:0 15px 50px 0;} | ||
+ | |||
+ | .infos ul{color:#5a6060; font-family:'Open Sans'; font-size:14px; line-height:28px; } | ||
+ | |||
+ | .infos .circlearrow li{ display : list-item; list-style-image : url(https://static.igem.org/mediawiki/2013/9/94/Insa-toulouse2013-listpuce2.png);} | ||
+ | |||
+ | </style> | ||
+ | |||
+ | |||
+ | <script type="text/javascript" src="js/jquery.js"></script> | ||
+ | <script type="text/javascript"> | ||
+ | <!-- | ||
+ | $(document).ready(function(){ | ||
+ | // On cache les sous-menus : | ||
+ | $('div.accordeon div.infos').hide(); | ||
+ | // Curseur main sur les h2 | ||
+ | $('div.accordeon > h2.faq').css('cursor','pointer'); | ||
+ | $('div.accordeon > h2').click(function(){ | ||
+ | //si ouvert -> referme | ||
+ | if($(this).next('div.infos:visible').length!=0){ | ||
+ | $(this).next('div.infos').slideUp('normal'); | ||
+ | } | ||
+ | //si cache, on ferme les autres et on affiche | ||
+ | else { | ||
+ | $('div.accordeon div.infos').slideUp('normal'); | ||
+ | $(this).next('div.infos').slideDown('normal'); | ||
+ | } | ||
+ | return false; | ||
+ | }); | ||
+ | } ) ; | ||
+ | // --> | ||
+ | </script> | ||
</style> | </style> | ||
Line 106: | Line 155: | ||
<div class="clear"></div> | <div class="clear"></div> | ||
+ | <div class="accordeon"> | ||
- | < | + | <h2 class="faq" title="Click to open the FAQ">June 2013</h2> |
- | + | <div class="infos"> | |
- | + | ||
- | < | + | |
<ul class="circlearrow"> | <ul class="circlearrow"> | ||
<li><span class="spantitle2">Week 3 (24-30 June)</span></br> | <li><span class="spantitle2">Week 3 (24-30 June)</span></br> | ||
Line 119: | Line 167: | ||
</ul> | </ul> | ||
</li> | </li> | ||
- | < | + | </div> |
+ | </div> | ||
+ | <div class="clear"></div> | ||
+ | |||
+ | |||
+ | <div class="accordeon"> | ||
+ | |||
+ | <h2 class="faq" title="Click to open the FAQ">July 2013</h2> | ||
+ | <div class="infos"> | ||
<ul class="circlearrow"> | <ul class="circlearrow"> | ||
<li><span class="spantitle2">Week 4 (1-7 July)</span><br> | <li><span class="spantitle2">Week 4 (1-7 July)</span><br> | ||
Line 125: | Line 181: | ||
<img src="https://static.igem.org/mediawiki/2013/e/ef/General_inducer_-_h140px.png" class="imgcontent" /></li> | <img src="https://static.igem.org/mediawiki/2013/e/ef/General_inducer_-_h140px.png" class="imgcontent" /></li> | ||
<li><span class="spantitle2">Week 5 (8-14 July)</span><br> | <li><span class="spantitle2">Week 5 (8-14 July)</span><br> | ||
- | Assembly of Strong promoter-tetR with Ptet-RFP. The RFP should be inhibited by tetR and expressed in presence of | + | Assembly of Strong promoter-tetR with Ptet-RFP. The RFP should be inhibited by tetR and expressed in presence of atc.<br> |
<img src="https://static.igem.org/mediawiki/2013/b/b2/General_inducer2_-_h140px.png" class="imgcontent" /><br> | <img src="https://static.igem.org/mediawiki/2013/b/b2/General_inducer2_-_h140px.png" class="imgcontent" /><br> | ||
The construction is then sent for sequencing.<br><br> | The construction is then sent for sequencing.<br><br> | ||
Line 136: | Line 192: | ||
We assembled a Strong promoter with tetR-Ptet-RFP to finalize the construction.<br><br> | We assembled a Strong promoter with tetR-Ptet-RFP to finalize the construction.<br><br> | ||
</li> | </li> | ||
- | </ | + | </div> |
- | </ | + | </div> |
- | <li><a href="">August 2013</a> | + | <div class="clear"></div> |
+ | |||
+ | |||
+ | <div class="accordeon"> | ||
+ | |||
+ | <h2 class="faq" title="Click to open the FAQ">August 2013</h2> | ||
+ | <div class="infos"> | ||
+ | <ul class="circlearrow"> | ||
+ | <li><a href="">August 2013</a> | ||
<ul class="circlearrow"> | <ul class="circlearrow"> | ||
<li><span class="spantitle2">Week 8 (29-4 August)</span><br> | <li><span class="spantitle2">Week 8 (29-4 August)</span><br> | ||
Line 149: | Line 213: | ||
<img src="https://static.igem.org/mediawiki/2013/5/59/General_inducer5_-_h140px.png" class="imgcontent" /><br> | <img src="https://static.igem.org/mediawiki/2013/5/59/General_inducer5_-_h140px.png" class="imgcontent" /><br> | ||
This one seems to work but we are waiting for the sequencing to confirm the construct.<br><br></li> | This one seems to work but we are waiting for the sequencing to confirm the construct.<br><br></li> | ||
- | + | </div> | |
- | + | ||
- | + | ||
- | + | ||
- | </ | + | |
- | + | ||
</div> | </div> | ||
- | |||
- | |||
<div class="clear"></div> | <div class="clear"></div> | ||
+ | <div class="clear"></div> | ||
+ | |||
<p class="texte"> | <p class="texte"> | ||
<img src="https://static.igem.org/mediawiki/2013/3/3a/Back_arrow_-_14px.png"class="imgcontent2" /><a href="https://2013.igem.org/Team:INSA_Toulouse/contenu/lab_practice/notebook/calendar/wet_lab">Back to Wet Lab</a></p> | <img src="https://static.igem.org/mediawiki/2013/3/3a/Back_arrow_-_14px.png"class="imgcontent2" /><a href="https://2013.igem.org/Team:INSA_Toulouse/contenu/lab_practice/notebook/calendar/wet_lab">Back to Wet Lab</a></p> |
Latest revision as of 17:35, 4 October 2013
Calendar
General Inducer Characterization
June 2013
- Week 3 (24-30 June)
Amplification of new biobricks for cloning:
BBa_J23119: Strong promoter,
BBa_P0440: rbs tetR term,
BBa_I13521: Ptet rbs RFP term.
July 2013
- Week 4 (1-7 July)
Assembly of a strong promoter with tetR. tetR protein is necessary to inhibit the Ptet promoter.
- Week 5 (8-14 July)
Assembly of Strong promoter-tetR with Ptet-RFP. The RFP should be inhibited by tetR and expressed in presence of atc.
The construction is then sent for sequencing.
- Week 6 (15-21 July)
The sequencing shows that the construction include a mutated promoter instead of J23119. So we assembled tetR with Ptet-RFP.
- Week 7 (22-28 July)
We assembled a Strong promoter with tetR-Ptet-RFP to finalize the construction.
August 2013
- August 2013
- Week 8 (29-4 August)
The tries didn’t work, so we did it again one more week the assembly of Strong Promoter with tetR-Ptet-RFP. - Week 9 (5-11 August)
Because none of last clonages worked, we tried with several promoters in order to increase our chances of success.
- Week 10 (12-18 August)
None of the passed assemblies worked, so we tried with a weak promoter.
This one seems to work but we are waiting for the sequencing to confirm the construct.
- Week 8 (29-4 August)