Team:INSA Toulouse/contenu/lab practice/notebook/calendar/general inducer
From 2013.igem.org
(Difference between revisions)
Mesnageclem (Talk | contribs) |
|||
Line 125: | Line 125: | ||
<img src="https://static.igem.org/mediawiki/2013/e/ef/General_inducer_-_h140px.png" class="imgcontent" /></li> | <img src="https://static.igem.org/mediawiki/2013/e/ef/General_inducer_-_h140px.png" class="imgcontent" /></li> | ||
<li><span class="spantitle2">Week 5 (8-14 July)</span><br> | <li><span class="spantitle2">Week 5 (8-14 July)</span><br> | ||
- | Assembly of Strong promoter-tetR with Ptet-RFP. The RFP should be inhibited by tetR and expressed in presence of | + | Assembly of Strong promoter-tetR with Ptet-RFP. The RFP should be inhibited by tetR and expressed in presence of atc.<br> |
<img src="https://static.igem.org/mediawiki/2013/b/b2/General_inducer2_-_h140px.png" class="imgcontent" /><br> | <img src="https://static.igem.org/mediawiki/2013/b/b2/General_inducer2_-_h140px.png" class="imgcontent" /><br> | ||
The construction is then sent for sequencing.<br><br> | The construction is then sent for sequencing.<br><br> |
Revision as of 10:05, 27 September 2013
Calendar
General Inducer Characterization
- June 2013
- Week 3 (24-30 June)
Amplification of new biobricks for cloning:
BBa_J23119: Strong promoter,
BBa_P0440: rbs tetR term,
BBa_I13521: Ptet rbs RFP term.
- Week 3 (24-30 June)
Amplification of new biobricks for cloning:
- July 2013
- Week 4 (1-7 July)
Assembly of a strong promoter with tetR. tetR protein is necessary to inhibit the Ptet promoter.
- Week 5 (8-14 July)
Assembly of Strong promoter-tetR with Ptet-RFP. The RFP should be inhibited by tetR and expressed in presence of atc.
The construction is then sent for sequencing.
- Week 6 (15-21 July)
The sequencing shows that the construction include a mutated promoter instead of J23119. So we assembled tetR with Ptet-RFP.
- Week 7 (22-28 July)
We assembled a Strong promoter with tetR-Ptet-RFP to finalize the construction.
- Week 4 (1-7 July)
- August 2013
- Week 8 (29-4 August)
The tries didn’t work, so we did it again one more week the assembly of Strong Promoter with tetR-Ptet-RFP. - Week 9 (5-11 August)
Because none of last clonages worked, we tried with several promoters in order to increase our chances of success.
- Week 10 (12-18 August)
None of the passed assemblies worked, so we tried with a weak promoter.
This one seems to work but we are waiting for the sequencing to confirm the construct. - Week 11 (19-25 August)
- Week 8 (29-4 August)