Last program was a touch up program with 60°C annealing and 10 cycles with a temperature increment of 0.5°C per cycle this was looped 5 times so the final amount of annealing cycles was 50. Extension time was still 2:00 and this program was done on tube: 5+6, 11+12, 17+18, 23+24. | Last program was a touch up program with 60°C annealing and 10 cycles with a temperature increment of 0.5°C per cycle this was looped 5 times so the final amount of annealing cycles was 50. Extension time was still 2:00 and this program was done on tube: 5+6, 11+12, 17+18, 23+24. | ||
- | Purification was done by gel purification, see picture. | + | Purification was done by gel purification, see picture below. |
[[File:30.06.13 all PCR products purification gel.jpg|thumb|left|Purification gel with big well number one(left uppermost) containing 1+2 next 3+4, 5+6, 7+8, 9+10, 11+12, next line from left to right; 13+17, 14+16, failed well, 21+22, 24]] | [[File:30.06.13 all PCR products purification gel.jpg|thumb|left|Purification gel with big well number one(left uppermost) containing 1+2 next 3+4, 5+6, 7+8, 9+10, 11+12, next line from left to right; 13+17, 14+16, failed well, 21+22, 24]] | ||
+ | |||
+ | After all PCR-products were purified the backbone was prepared for DpnI treatment and the right amount of each of the other PCR-products were mixed. Finally the DpnI treated backbone was added USER-enzyme and BSA, mixed with the appropriate PCR-products and set for reaction. | ||
+ | |||
+ | The constructs were transformed into chemical competent E.coli right after construction and incubated 2 hours in SOC before plated on Kana plates. | ||
Line 32: | Line 36: | ||
== Conclusion from today == | == Conclusion from today == | ||
- | + | All PCR-products have been made and the programs for each product have been determined. |
Revision as of 04:42, 1 July 2013
Contents |
208 lab
Main purposes today
New PCR with x7-polymerase.
who were in the lab
Kristian
Procedure
Made PCRs on pZA21, GFP SF TAT, GFP SF Sec and RFP all samples where made in duplicates.
In tube 1+2+3+4+5+6 where pZA21. In 7+8+9+10+11+12 GFP SF TAT In 13+14+15+16+17+18 GFP SF Sec In 19+20+21+22+23+24 RFP
First program was 45°C annealing and 2:00 extension time with tube: 1+2, 7+8, 13+14, 19+20. Second program was ramp 68°C → 60°C annealing and 2:00 extension time with tube: 3+4, 9+10, 15+16, 21+22. Last program was a touch up program with 60°C annealing and 10 cycles with a temperature increment of 0.5°C per cycle this was looped 5 times so the final amount of annealing cycles was 50. Extension time was still 2:00 and this program was done on tube: 5+6, 11+12, 17+18, 23+24.
Purification was done by gel purification, see picture below.
After all PCR-products were purified the backbone was prepared for DpnI treatment and the right amount of each of the other PCR-products were mixed. Finally the DpnI treated backbone was added USER-enzyme and BSA, mixed with the appropriate PCR-products and set for reaction.
The constructs were transformed into chemical competent E.coli right after construction and incubated 2 hours in SOC before plated on Kana plates.
Results
Conclusion from today
All PCR-products have been made and the programs for each product have been determined.