Team:Grenoble-EMSE-LSU/Documentation/Notebook/July

From 2013.igem.org

(Difference between revisions)
(put the day numbers in the week titles)
Line 18: Line 18:
<li id="titre">
<li id="titre">
<h1>July</h1>
<h1>July</h1>
-
                                     <h2>Week 1</h2>
+
                                     <h2>Week 1 (1-5)</h2>
                                           <h3>Monday</h3>
                                           <h3>Monday</h3>
    <p>- Present our project to the American Summer School (poster) at Maison Minatec in Grenoble. </br>
    <p>- Present our project to the American Summer School (poster) at Maison Minatec in Grenoble. </br>
Line 36: Line 36:
    <p>- The transformations work more or less for all of them but there is only one colony for the transformed cells with 3 plasmids</br>
    <p>- The transformations work more or less for all of them but there is only one colony for the transformed cells with 3 plasmids</br>
- Put three clones of each Petri dish in 3 mL of LB medium to make them grow overnight with the appropriate antibiotics</p>
- Put three clones of each Petri dish in 3 mL of LB medium to make them grow overnight with the appropriate antibiotics</p>
-
                                         <h2>Week 2</h2>
+
                                         <h2>Week 2 (8-12)</h2>
                                           <h3>Monday</h3>
                                           <h3>Monday</h3>
    <p>- Draw a first draft of the Printed Circuit Board (PCB) for the photodiode</br>
    <p>- Draw a first draft of the Printed Circuit Board (PCB) for the photodiode</br>
Line 54: Line 54:
                                           <h3>Friday</h3>
                                           <h3>Friday</h3>
    <p></p>
    <p></p>
-
                                         <h2>Week 3</h2>
+
                                         <h2>Week 3 (15-19)</h2>
                                           <h3>Monday</h3>
                                           <h3>Monday</h3>
    <p>- Put Voigt 1&3 in liquid culture with 4x Xgal ON</p>
    <p>- Put Voigt 1&3 in liquid culture with 4x Xgal ON</p>
Line 83: Line 83:
- Test the PCB that control the intensity of the light with a function generator and the oscilloscope, it works well.</br>
- Test the PCB that control the intensity of the light with a function generator and the oscilloscope, it works well.</br>
- Notice that the connector on the photodiode PCB is not welded on the right side</br></p>
- Notice that the connector on the photodiode PCB is not welded on the right side</br></p>
-
                                         <h2>Week 4</h2>
+
                                         <h2>Week 4 (22-26)</h2>
                                           <h3>Monday</h3>
                                           <h3>Monday</h3>
    <p>- Weld the connector on the photodiode PCB on the right side</br>
    <p>- Weld the connector on the photodiode PCB on the right side</br>

Revision as of 18:41, 1 October 2013

Grenoble-EMSE-LSU, iGEM


Grenoble-EMSE-LSU, iGEM

Retrieved from "http://2013.igem.org/Team:Grenoble-EMSE-LSU/Documentation/Notebook/July"