Team:Grenoble-EMSE-LSU/Documentation/Notebook/July

From 2013.igem.org

(Difference between revisions)
Line 102: Line 102:
- Test the PCB that control the intensity of the light with a function generator and the oscilloscope, it works well.</br>
- Test the PCB that control the intensity of the light with a function generator and the oscilloscope, it works well.</br>
- Notice that the connector on the photodiode PCB is not welded on the right side</br></p>
- Notice that the connector on the photodiode PCB is not welded on the right side</br></p>
 +
 +
<p><strong>pBad-RBS-sspB</strong>
 +
<br>new culture and miniprep of sspb : 173 ng/µL </p>
                                         <h2>Week 4 (22-26)</h2>
                                         <h2>Week 4 (22-26)</h2>
                                           <h3>Monday</h3>
                                           <h3>Monday</h3>
Line 122: Line 125:
                                           <h3>Friday</h3>
                                           <h3>Friday</h3>
    <p>- Have a <strong>big and long meeting with the advisor</strong></br></p>
    <p>- Have a <strong>big and long meeting with the advisor</strong></br></p>
-
                                           <h3>Mondday</h3>
+
                                           <h3>Monday</h3>
    <p>- Try to measure fluorecence by changing filters or adding blue filter (as a low pass filter) but it does not improve the measurement.</br>
    <p>- Try to measure fluorecence by changing filters or adding blue filter (as a low pass filter) but it does not improve the measurement.</br>
</p>
</p>

Revision as of 11:26, 4 October 2013

Grenoble-EMSE-LSU, iGEM


Grenoble-EMSE-LSU, iGEM

Retrieved from "http://2013.igem.org/Team:Grenoble-EMSE-LSU/Documentation/Notebook/July"