Team:EPF Lausanne/Calendar/23 July 2013

From 2013.igem.org

(Difference between revisions)
 
Line 1: Line 1:
{{Template:EPFL2013Header}}
{{Template:EPFL2013Header}}
-
'''Cell Surface Display'''
+
<font size = "4">Cell Surface Display</font>
''No bench work'' <BR>
''No bench work'' <BR>
Waiting on our designed primers to arrive, we were looking at the litterature and thinking of our next experiments.
Waiting on our designed primers to arrive, we were looking at the litterature and thinking of our next experiments.
 +
<BR> <BR>
-
'''General'''
+
<font size = "4">General</font>
''Competent cells try 1''  <BR>
''Competent cells try 1''  <BR>
We transformed the cell that we made competent in the weeks before with the PUC19 plasmid in order to see if they worked.
We transformed the cell that we made competent in the weeks before with the PUC19 plasmid in order to see if they worked.
{{Template:EPFL2013Footer}}
{{Template:EPFL2013Footer}}

Latest revision as of 14:46, 3 October 2013

Taxi.Coli: Smart Drug Delivery iGEM EPFL

Header

Cell Surface Display

No bench work
Waiting on our designed primers to arrive, we were looking at the litterature and thinking of our next experiments.

General

Competent cells try 1
We transformed the cell that we made competent in the weeks before with the PUC19 plasmid in order to see if they worked.