Team:Utah State/Parts

From 2013.igem.org

(Difference between revisions)
Line 34: Line 34:
<br>
<br>
<br> <br>
<br> <br>
-
<img src="https://static.igem.org/mediawiki/igem.org/6/6d/Biobricks.png" alt="GFP" width="700" height="500">
+
<img src="https://static.igem.org/mediawiki/igem.org/6/6d/Biobricks.png">
<br>
<br>
Figure shows the different constructs designed, built, and tested by Utah State iGEM team 2013
Figure shows the different constructs designed, built, and tested by Utah State iGEM team 2013

Revision as of 19:33, 27 September 2013






This year Utah State iGEM team submitted 16 new BioBricks to the registry. A further 47 intermediate and full AMP constructs were created but not submitted to the Registry. These additional parts are available to other groups upon request.





Figure shows the different constructs designed, built, and tested by Utah State iGEM team 2013




















<groupparts>iGEM013 Utah_State</groupparts>