Team:ZJU-China/Notebook/LabNotes/May

From 2013.igem.org

(Difference between revisions)
(Lab Notes: May)
Line 13: Line 13:
{|
{|
|-
|-
-
!width="100px"|Date
+
!width="80px"|Date
-
!width="100px"|Notes
+
!Notes
|-
|-
|May 24th||First lab day! Calibrate the pipettes, and check the working status of PCR machines. Made a plan for wet lab work.  
|May 24th||First lab day! Calibrate the pipettes, and check the working status of PCR machines. Made a plan for wet lab work.  

Revision as of 15:58, 25 September 2013

Flag Counter

Lab Notes: May

Date Notes
May 24thFirst lab day! Calibrate the pipettes, and check the working status of PCR machines. Made a plan for wet lab work.
May 25thSet up new LB+Ch1 culture plates. BBa_K411003 culture. Sterilization of culture plates, cuvettes, centrifuge tubes, and PCR tubes.
May 26thPCR amplification of BBa_K411003.
May 27thCut BBa_K411003 and pSB1c3 with EcoR I and Pst I.
May 28thGel electrophoresis of the PCR products on May 27th. Failed because of inadequate operations.
May 29thCollect the products of PCR on May 28th. Cut BBa_K411003 with E+P and transform.
May 30thFind out that pSB1c3 and pK411003 colonies are in good condition. Pick up colonies of these parts and transform again.
May 31stGel electrophoresis to analyze the results of transformation --- failed. Plasmid purification of pSB1c3.