Team:DTU-Denmark/Notebook/30 June 2013

From 2013.igem.org

(Difference between revisions)
(208 lab)
(208 lab)
Line 16: Line 16:
In 19+20+21+22+23+24 RFP
In 19+20+21+22+23+24 RFP
-
First program was 55°C annealing and 2:00 extension time with tube: 1+2, 3+4.
+
First program was 45°C annealing and 2:00 extension time with tube: 1+2, 7+8, 13+14, 19+20.
-
Second program was 64°C annealing and 2:00 extension time with tube: 5+6, 7+8.
+
Second program was ramp 68°C → 60°C annealing and 2:00 extension time with tube: 3+4, 9+10, 15+16, 21+22.
-
Last program was 69°C annealing and 1:00 extension time with tube: 9+10.
+
Last program was a touch up program with 60°C annealing and 10 cycles with a temperature increment of 0.5°C per cycle this was looped 5 times so the final amount of annealing cycles was 50. Extension time was still 2:00 and this program was done on tube: 5+6, 11+12, 17+18, 23+24.
 +
 
 +
Purification was done by gel purification, see picture.
 +
[[File:30.06.13 all PCR products purification gel.jpg|thumb|left|Purification gel with big well number one(left uppermost) containing 1+2 next 3+4, 5+6, 7+8, 9+10, 11+12, next line from left to right; 13+17, 14+16, failed well, 21+22, 24]]

Revision as of 04:37, 1 July 2013

Contents

208 lab

Main purposes today

New PCR with x7-polymerase.


who were in the lab

Kristian

Procedure

Made PCRs on pZA21, GFP SF TAT, GFP SF Sec and RFP all samples where made in duplicates.

In tube 1+2+3+4+5+6 where pZA21. In 7+8+9+10+11+12 GFP SF TAT In 13+14+15+16+17+18 GFP SF Sec In 19+20+21+22+23+24 RFP

First program was 45°C annealing and 2:00 extension time with tube: 1+2, 7+8, 13+14, 19+20. Second program was ramp 68°C → 60°C annealing and 2:00 extension time with tube: 3+4, 9+10, 15+16, 21+22. Last program was a touch up program with 60°C annealing and 10 cycles with a temperature increment of 0.5°C per cycle this was looped 5 times so the final amount of annealing cycles was 50. Extension time was still 2:00 and this program was done on tube: 5+6, 11+12, 17+18, 23+24.

Purification was done by gel purification, see picture.

Purification gel with big well number one(left uppermost) containing 1+2 next 3+4, 5+6, 7+8, 9+10, 11+12, next line from left to right; 13+17, 14+16, failed well, 21+22, 24


Results

The gel from the days PCR. From first lane is a 100 bp ladder and thereafter the well number follows the numbers of the tubes -1. Note that tube number 15 is missing
The gel from the days PCR. From first lane is a 100 bp ladder and thereafter tube 20,21,22,23 and 24. Note that there is also primer blur in subsequent wells to the right; these are just double test wells to test previous PCR products


Conclusion from today

...