Team:NTNU-Trondheim/4 July 2013

From 2013.igem.org

Revision as of 13:57, 4 July 2013 by Mariakan (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Thursday 04.07.2013

Continuation of the small-scale vesicle preparation according to the vesicle isolation protocol. Step 8-12 was completed with the exception that the pallet was resuspended in 0.5 mL DPBSS insted of 100 µL in step 11 and that the check for sterility was not performed in step 12.