Team:Poznan-BioInf/Book
From 2013.igem.org
(Difference between revisions)
(v01) |
(dates) |
||
Line 62: | Line 62: | ||
laboratory equipments. During the tests we're looking for a suitable GFP. From now on we start to working with BBa_E0040, which exhibits bright green fluorescence. | laboratory equipments. During the tests we're looking for a suitable GFP. From now on we start to working with BBa_E0040, which exhibits bright green fluorescence. | ||
- | <h4> | + | <h4>June.</h4> |
- | <h5>1st | + | <h5>1st-4th week</h5> |
Line 75: | Line 75: | ||
distributor to get valuation of their products. Unfortunately to us the holidays begins so we encounter obstructs with making an appointments. | distributor to get valuation of their products. Unfortunately to us the holidays begins so we encounter obstructs with making an appointments. | ||
- | <h5> | + | <h4>July.</h4> |
+ | <h5>5th-6th week</h5> | ||
We shake off from the shock. | We shake off from the shock. | ||
Line 81: | Line 82: | ||
waiting for the reply from distributors. | waiting for the reply from distributors. | ||
- | <h5> | + | <h5>7th week</h5> |
We are still trying to make an order at the biotechnological companies, so.. we are | We are still trying to make an order at the biotechnological companies, so.. we are | ||
gathering the signatures and forcing the offices of administration. | gathering the signatures and forcing the offices of administration. | ||
- | <h5> | + | <h5>8th week</h5> |
We are still waiting... | We are still waiting... | ||
- | + | ||
- | <h5> | + | <h4>August.</h5> |
+ | |||
+ | <h5>9th-10th week</h5> | ||
We're done with waiting. | We're done with waiting. | ||
Just kidding. | Just kidding. | ||
We feel more like administrative labours than scientists.. - not kidding. | We feel more like administrative labours than scientists.. - not kidding. | ||
- | + | <h5>11th-12th week</h5> | |
We've receive the first part (one third) of our order of lab equipments. | We've receive the first part (one third) of our order of lab equipments. | ||
- | We are seeing the light in the end of the tunnel, | + | We are seeing the light in the end of the tunnel, yay! |
Now, we could calmly put everything into designing our oligos and synthetic genes. | Now, we could calmly put everything into designing our oligos and synthetic genes. | ||
- | We could start to planning the oligos not until we were certain, that we will get the second tranche of government | + | We could start to planning the oligos not until we were certain, that we will get the second tranche of government funds. |
- | <h5> | + | |
+ | <h4>Semptember.</h5> | ||
+ | |||
+ | <h5>11 week</h5> | ||
This week we've isolated the chromosome E. coli strain DH5alpha. From bacterial chromosome we want to pull out: | This week we've isolated the chromosome E. coli strain DH5alpha. From bacterial chromosome we want to pull out: | ||
Line 110: | Line 116: | ||
Continously we are designing of our constructs. (redirection) | Continously we are designing of our constructs. (redirection) | ||
- | <h5> | + | <h5>12 week</h5> |
We received the first part of our oligos. | We received the first part of our oligos. | ||
We were ably to make the PCR of our promoters, backbones with proper resistances. | We were ably to make the PCR of our promoters, backbones with proper resistances. | ||
Line 121: | Line 127: | ||
4. arabinose promoter | 4. arabinose promoter | ||
- | <h5> | + | <h5>13 week</h5> |
We've received the second part of oligos and synthetic genes. | We've received the second part of oligos and synthetic genes. | ||
We are able to make the PCR reaction of fluorescent proteins: BFP, GFP and mRFP of our design, optimize for E. coli bacterium with three | We are able to make the PCR reaction of fluorescent proteins: BFP, GFP and mRFP of our design, optimize for E. coli bacterium with three | ||
different tags, which should speed up the degradation of the proteins. | different tags, which should speed up the degradation of the proteins. | ||
- | <h5> | + | <h5>14 week</h5> |
Let's start the Gibson assembly! | Let's start the Gibson assembly! | ||
Protocol you can find here. | Protocol you can find here. |
Revision as of 00:41, 5 October 2013