Team:DTU-Denmark/Notebook/30 June 2013

From 2013.igem.org

(Difference between revisions)
(who were in the lab)
 
(2 intermediate revisions not shown)
Line 1: Line 1:
{{:Team:DTU-Denmark/Templates/StartPage|30 June 2013}}
{{:Team:DTU-Denmark/Templates/StartPage|30 June 2013}}
-
 
+
Navigate to the [[Team:DTU-Denmark/Notebook/29_June_2013|Previous]] or the [[Team:DTU-Denmark/Notebook/1_July_2013|Next]] Entry
=208 lab=
=208 lab=
<hr/>
<hr/>
Line 7: Line 7:
New PCR with x7-polymerase.
New PCR with x7-polymerase.
-
==who were in the lab==
+
==Who was in the lab==
<hr/>
<hr/>
Kristian
Kristian
Line 43: Line 43:
All PCR-products have been made and the programs for each product have been determined.
All PCR-products have been made and the programs for each product have been determined.
-
<hr/>
+
 
Navigate to the [[Team:DTU-Denmark/Notebook/29_June_2013|Previous]] or the [[Team:DTU-Denmark/Notebook/1_July_2013|Next]] Entry
Navigate to the [[Team:DTU-Denmark/Notebook/29_June_2013|Previous]] or the [[Team:DTU-Denmark/Notebook/1_July_2013|Next]] Entry
{{:Team:DTU-Denmark/Templates/EndPage}}
{{:Team:DTU-Denmark/Templates/EndPage}}

Latest revision as of 18:09, 30 September 2013

30 June 2013

Navigate to the Previous or the Next Entry

Contents

208 lab


Main purposes today


New PCR with x7-polymerase.

Who was in the lab


Kristian

Procedure


Made PCRs on pZA21, GFP SF TAT, GFP SF Sec and RFP all samples where made in duplicates.

In tube 1+2+3+4+5+6 where pZA21. In 7+8+9+10+11+12 GFP SF TAT In 13+14+15+16+17+18 GFP SF Sec In 19+20+21+22+23+24 RFP

First program was 45°C annealing and 2:00 extension time with tube: 1+2, 7+8, 13+14, 19+20. Second program was ramp 68°C → 60°C annealing and 2:00 extension time with tube: 3+4, 9+10, 15+16, 21+22. Last program was a touch up program with 60°C annealing and 10 cycles with a temperature increment of 0.5°C per cycle this was looped 5 times so the final amount of annealing cycles was 50. Extension time was still 2:00 and this program was done on tube: 5+6, 11+12, 17+18, 23+24.

Purification was done by gel purification, see picture below.

Purification gel with big well number one(left uppermost) containing 1+2 next 3+4, 5+6, 7+8, 9+10, 11+12, next line from left to right; 13+17, 14+16, failed well, 21+22, 24


After all PCR-products were purified the backbone was prepared for DpnI treatment and the right amount of each of the other PCR-products were mixed. Finally the DpnI treated backbone was added USER-enzyme and BSA, mixed with the appropriate PCR-products and set for reaction.

The constructs were transformed into chemical competent E.coli right after construction and incubated 2 hours in SOC before plated on Kana plates.





Results


The gel from the days PCR. From first lane is a 100 bp ladder and thereafter the well number follows the numbers of the tubes -1. Note that tube number 15 is missing
The gel from the days PCR. From first lane is a 100 bp ladder and thereafter tube 20,21,22,23 and 24. Note that there is also primer blur in subsequent wells to the right; these are just double test wells to test previous PCR products

















Conclusion from today


All PCR-products have been made and the programs for each product have been determined.


Navigate to the Previous or the Next Entry