Line 106: | Line 106: | ||
<font size="4"> '''3/25/13''' </font> | <font size="4"> '''3/25/13''' </font> | ||
- | |||
- | |||
- Reported on past week and plans for this week | - Reported on past week and plans for this week | ||
Line 126: | Line 124: | ||
: T7 major vs minor | : T7 major vs minor | ||
:: Minor is longer, but not necessary – the tail overhang is due to ribosome moving two codons downstream instead of three | :: Minor is longer, but not necessary – the tail overhang is due to ribosome moving two codons downstream instead of three | ||
- | : Suggest we can direct mutation to the poly-U site and prevent ribosome slippage | + | :: Suggest we can direct mutation to the poly-U site and prevent ribosome slippage |
: Qbeta major vs minor | : Qbeta major vs minor |
Revision as of 00:04, 30 May 2013
Small Phage March - April Notebook: March 15 - March 31 Daily Log
| ||
|
3/15/13 - Today marks the start of our Small Phage Team! - Went over iGem parts database, PCR database. - Shared results from individual background research.
- Did more background research and brainstormed ideas for a plan of attack
3/16/13 - Did more background reading for T7; literature search for possible plan of attack
3/18/13 - Presented current understanding and plans for the future
- More background research
3/20/13 - Background research on phiX174: the only phage we have in stock - Performed 3.20 Phage Viability Test
3/21/13 - Checked up on results for 3.20 Phage Viability Test
3/22/13 - Discussed results from tittering experiment (preliminary experiment 1)
- Discussed step of attack with Dr. Grose
- Sequencing will be for individual genes to cut down cost
- Learnt about Mega5 to compare genome and protein sequence
3/25/13 - Reported on past week and plans for this week
- Start working on designing our site directed mutagenesis
- Research into in-vitro assembly vs direct mutation of phage genome
3/27/13 - More research on genome of enterobacteria phage
- Outlined protocol for producing stock top agar
3/29/13 - Worked on our first team presentation.
|