Team:BYU Provo/Notebook/Phage Purification/Winterexp/Period11/Dailylog

From 2013.igem.org

(Difference between revisions)
Line 62: Line 62:
<font size="4"> '''8/28/13''' </font>
<font size="4"> '''8/28/13''' </font>
 +
 +
- Discussed the possible gradients we could perform to get T4 to band.  We are thinking of running a wild type gradient with different concentrations at 1.1, 1.2, 1.3, 1.4, 1.5, 1.6, and 1.7.  This should give us a rough estimate of where the wild type will band.
<br>
<br>

Revision as of 20:12, 6 September 2013


Phage Purification July - August Notebook: August 17 - August 31 Daily Log



Overview
March-April
May-June
July-August
September-October


<< Previous Next >>


8/19/13


8/21/13


8/23/13

- Prepared a Cesium Chloride Gradient for T4

8.23 CsCl gradient


8/26/13

- Reviewed results for the T4 gradient. We are having issues getting the T4 to band. When we remove the gradient after centrifuging we are unable to see any band at all. A spot test reveals phage are found all over the gradient. We have had this same result several times and believe that the cesium chloride we are using could be the factor. Our plan is to do a very broad test and see if we can get the phage to band anywhere.


8/28/13

- Discussed the possible gradients we could perform to get T4 to band. We are thinking of running a wild type gradient with different concentrations at 1.1, 1.2, 1.3, 1.4, 1.5, 1.6, and 1.7. This should give us a rough estimate of where the wild type will band.



<< Previous Next >>