Team:Braunschweig/Notebook

From 2013.igem.org

(Difference between revisions)
Line 697: Line 697:
     <h2><a href="#Week12">Week 12: August 4 - August 10, 2013</a></h2>
     <h2><a href="#Week12">Week 12: August 4 - August 10, 2013</a></h2>
     <p><p style=" margin-left:5px; margin-right:5px;">
     <p><p style=" margin-left:5px; margin-right:5px;">
-
This week was overshadowed by contaminated medium interfering with our experiments. We man-aged to transform the final eforRed construct (K10730359 in <i>E. coli</i> Top10F’ as the promoto seemed to not be leaky in this strain and successfully conducted a growth curve experiment showing a different in growth between induced and non-induced cultures. We are still missing our Las-inducible aeBlue construct.</p>
+
This week was overshadowed by contaminated medium interfering with our experiments. We managed to transform the final eforRed construct (K10730359 in <i>E. coli</i> Top10F’ as the promoto seemed to not be leaky in this strain and successfully conducted a growth curve experiment showing a different in growth between induced and non-induced cultures. We are still missing our Las-inducible aeBlue construct.</p>
<p><img alt="grey line" src="https://static.igem.org/mediawiki/2013/4/4c/Braunschweig_grey_line.png" width="850" height="1" vspace="20"/></p>
<p><img alt="grey line" src="https://static.igem.org/mediawiki/2013/4/4c/Braunschweig_grey_line.png" width="850" height="1" vspace="20"/></p>

Revision as of 18:05, 4 October 2013

Labjournal

linie rot 8pix hoch

This is the documentation of our lab work. An overview on how we approached this project can be found under Approach. For detailed protocols of certain procedures please refer to Protocols. Attributions are given for each day, however please check our Attributions section for efforts beyond the lab work.

Our sponsors

linie rot 8pix hoch