Team:SDU-Denmark/Tour41
From 2013.igem.org
Complete Journal
Protocols & important dates
"If it is not documented, it doesn’t exist." - Louis Fried
Obviously, Louis Fried was wrong - and luckily so, we might add! But it is true that if it is not documented, we don't know whether it exist. So please, click through the tabs below and catch a quick glimpse of our most treasured moments of the summer. We kept a calender of special events since the start of the project. And if you have the yearning (particularly after reading our Results), open up our thorough protocols below.
February
28.02.2013 - Assembly of the team
March
08.03.2013 - 10.03.2013 - Teambuilding: iGEM crash course (DTU)
21.03.2013 - First meeting: get to know each other
26.03.2013 - Two new members of the team (Mattias and Sofie)
April
Brainstorming
May
08.05.2013 - Determination of project
July
11.07.2013 - One new member of the group (Nicky)
April
29.04.2013 - Social dinner and introduction to wiki design
July
11.07.2013 - Barbeque dinner
17.07.2013 - Tour des chambres
August
08.08.2013 - Squash tournament
22.08.2013 - Cabaret show, HCA festival 2013
31.08.2013 - 01.09.2013 - DK meetup
September
04.09.2013 - Supervisor Ann makes dinner for responsibility delegation meeting
25.09.2013 - Dinner after status meeting
26.09.2013 - Dinner with previous SDU iGEM teams
October
03.10.2013 - Late-night pizza
July
21.07.2013 - pSB1C3-Pcon-dxs(B. subtilis)-amilCP
25.07.2013 - B.sub DXS biobrick
25.07.2013 - E.coli IspG biobrick
29.07.2013 - pSB1C3-Plac-dxs(B. sub)-linker-GFP
31.07.2013 - pSB1C3-Plac-dxs(E. coli)-linker-GFP
August
01.08.2013 - We realized LacI should be overexpressed in order to get repression of the lac promoter
01.08.2013 - Sequencing of E. coli dxs standard part
05.08.2013 - pSB1C3-Plac-dxs(B. sub)
19.08.2013 - HRT2 biobrick
19.08.2013 - pSB1C3-Plac-dxs(E. coli)
19.08.2013 - pSB1C3-Pcon-lacI:LVA-term
17.09.2013 - LacI BioBrick
17.08.2013 - pSB1C3-Pcon-araC-term
21.08.2013 - pSB1C3-lacI:LVA-Plac-dxs(B. sub)
23.08.2013 - pSB1C3-lacI:LVA-Plac-dxs(B. sub)-linker-GFP
24.08.2013 - Characterization of lacI:LVA function
24.08.2013 - Confirmation that we could control the expression of Dxs with lacI:LVA using IPTG
28.08.2013 - pSB1C3-lacI:LVA-Plac-dxs(E. coli)
30.08.2013 - pSB1C3-Para-HRT2-(FLAG)
30.08.2013 - Growth experiment for MG1655/pSB1C3-lacI:LVA-Plac-dxs(B.sub)+/-GFP
September
13.09.2013 - pSB1C3-araC-Para-HRT2-(FLAG)
17.09.2013 - pSB1C3-lacI-Plac-dxs(B. sub)-linker-GFP
17.09.2013 - Characterized device with lacI and found that it functions better than lacI:LVA
20.09.2013 - Growth experiment for MG1655/pSB1C3-lacI-Plac-dxs(B.sub)
21.09.2013 - pSB1K3-araC-Para-HRT2-(FLAG)
21.09.2013 - Growth experiment for MG1655/pSB1C3-lacI-Plac-dxs(B.sub)-GFP
22.09.2013 - pSB1C3-lacI-Plac-dxs(B. sub)
October
01.10.2013 - Characterization of araC function
02.10.2013 - Confirmation that we could induce and control the expression of HRT2
August
09.08.2013 - Team project description due
30.08.2013 - Track selection
30.08.2013 - Project title
September
23.09.2013 - BioBricks Part DNA shipped to iGEM HQ
25.09.2013 - BioBricks Part DNA at the Registry (Received at iGEM)
October
04.10.2013 - Wiki freeze
11.10.2013 - 13.10.2013 - Regional Jamboree
When working together in a large group, particularly on such a large project, it is simply impossible for anyone to maintain an overview over the entire project in real time. That is why it is important to keep protocols of every part of the project, to document every experiment that is performed. This allows each team member to backtrack and to resolve any issues with (or mistakes made in) previous experiments. Countless digestions and hundreds of PCR reaction were done, and the explicit protocols established which setups were effective, and which were not. Our iGEM-team has kept protocols since the dawn of the project, and they have proven to be an invaluable resource, which saved us quite a bit of time. To ensure the consistency of execution, each experiment was done by following one of our Standard Operating Procedures, which can be found under "SOPs".
Click on the project title below to expand the window and get an overview of the protocols for each project part. Each protocol name is a link to a pdf file that will open in a new window. All were written on the basis of our Protocol Template
SDU2013 Protocol 0001 - USER primer design
SDU2013 Protocol 0002 - Standard primer design
SDU2013 Protocol 0050 - SDM on Plac - dxs (E. coli)
SDU2013 Protocol 0051 - SDM on dxs (E. coli) amilCP
SDU2013 Protocol 0006.1 - Dxs from B. subtilis
SDU2013 Protocol 0006.2 - Dxs from B. subtilis
SDU2013 Protocol 0017 - ispG
SDU2013 Protocol 0032 - Prenyltransferase
SDU2013 Protocol 0033 - lacI
SDU2013 Protocol 0034 - araC
SDU2013 Protocol 0037 - lacI and araC
SDU2013 Protocol 0039 - lacI without LVA-tag
SDU2013 Protocol 0019
SDU2013 Protocol 0020
SDU2013 Protocol 0021
SDU2013 Protocol 0022
SDU2013 Protocol 0023
SDU2013 Protocol 0024
SDU2013 Protocol 0025
SDU2013 Protocol 0026
SDU2013 Protocol 0028
SDU2013 Protocol 0029
SDU2013 Protocol 0030
SDU2013 Protocol 0031
SDU2013 Protocol 0035
SDU2013 Protocol 0036
SDU2013 Protocol 0041
SDU2013 Protocol 0042
SDU2013 Protocol 0043
SDU2013 Protocol 0044
SDU2013 Protocol 0045
SDU2013 Protocol 0046
SDU2013 Protocol 0048
SDU2013 Protocol 0040 - lacI device without LVA-tag
AmilCP
SDU2013 Protocol 0003
SDU2013 Protocol 0004
SDU2013 Protocol 0005
SDU2013 Protocol 0007
SDU2013 Protocol 0009
SDU2013 Protocol 0027
GFP
SDU2013 Protocol 0010
SDU2013 Protocol 0011
SDU2013 Protocol 0012
SDU2013 Protocol 0013
SDU2013 Protocol 0014
SDU2013 Protocol 0015
SDU2013 Protocol 0016
SDU2013 Protocol 0018
SDU2013 Protocol 0038
SDU2013 Protocol 0047