Team:Heidelberg/Templates/M-27-05-13
From 2013.igem.org
Revision as of 00:33, 4 October 2013 by JuliaS1992 (Talk | contribs)
Contents |
Power Cut
Power was down for 10 min in Labs --> Lab Materials should still be fine.
Labupdate
DelH
- DelH fragments are ready for ligation
- LacZ, AraC --> Cut again and purified
- Backbone --> New Backbone is being amplified in bacteria taken from stock
Plan: Purify, Digest and PCR of backbone (could then be ligated with DelH on wednesday)
Indigoidine
- Transformation of SVP and Bps in individual E.coli succeeded
Plan: Get BL23C3 and cotransform both Plasmids
General
- Partsregistry kit shipping: At the moment some problems with customs
- Lab materials will be ordered tomorrow
To do:
- Document glycerol stocks etc.
- Nikos: Ask Silvan and Jan if we can have script for getting PCR-protocols of PCR machine
- Hanna: Doodle for date for arranging everything in the lab
Symposium BMBF
- 27th of June
- Human practice?
- Poster has to be made --> don't put too much effort in it
- Nils starts creating a poster
Who wants to go?: Hanna, Philipp, Nils, Fanny, Tania, maybe Konrad?
Software
Statistics
- Script which gets data from databank to R is ready (uploaded on Github)
- Next step: designing apps
Webdesign
- rApache (Ilia) vs. Shiny (Nikos)
Cost analysis
- Complete one is not feasible
- Instead: Only analyse single methods (can be chosen by user, website returns protocols, costs, teams that have used the method)
- Next step: Look for methods, which could be analysed
General
- Which is our target group??
- Connect iGEM pulse with our project (for example evaluate our team with it)
Sponsoring
- Template mail for sponsoring is nearly ready
- Template project proposal of Eils didn't arrive yet