Team:Heidelberg/Templates/M-27-05-13

From 2013.igem.org

Revision as of 00:33, 4 October 2013 by JuliaS1992 (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Contents

Power Cut

Power was down for 10 min in Labs --> Lab Materials should still be fine.

Labupdate

DelH

  • DelH fragments are ready for ligation
  • LacZ, AraC --> Cut again and purified
  • Backbone --> New Backbone is being amplified in bacteria taken from stock

Plan: Purify, Digest and PCR of backbone (could then be ligated with DelH on wednesday)

Indigoidine

  • Transformation of SVP and Bps in individual E.coli succeeded

Plan: Get BL23C3 and cotransform both Plasmids

General

  • Partsregistry kit shipping: At the moment some problems with customs
  • Lab materials will be ordered tomorrow

To do:

  • Document glycerol stocks etc.
  • Nikos: Ask Silvan and Jan if we can have script for getting PCR-protocols of PCR machine
  • Hanna: Doodle for date for arranging everything in the lab

Symposium BMBF

  • 27th of June
  • Human practice?
  • Poster has to be made --> don't put too much effort in it
  • Nils starts creating a poster

Who wants to go?: Hanna, Philipp, Nils, Fanny, Tania, maybe Konrad?

Software

Statistics

  • Script which gets data from databank to R is ready (uploaded on Github)
  • Next step: designing apps

Webdesign

  • rApache (Ilia) vs. Shiny (Nikos)

Cost analysis

  • Complete one is not feasible
  • Instead: Only analyse single methods (can be chosen by user, website returns protocols, costs, teams that have used the method)
  • Next step: Look for methods, which could be analysed

General

  • Which is our target group??
  • Connect iGEM pulse with our project (for example evaluate our team with it)

Sponsoring

  • Template mail for sponsoring is nearly ready
  • Template project proposal of Eils didn't arrive yet