Team:DTU-Denmark/Notebook/3 September 2013
From 2013.igem.org
(Difference between revisions)
(Created page with "{{:Team:DTU-Denmark/Templates/StartPage|3 September 2013}} Navigate to the Previous or the [[Team:DTU-Denmark/Notebook/4_September...") |
|||
Line 18: | Line 18: | ||
100mL of ON cultures were pelleted. The protocol provided by QIAGEN Plasmid Kit was followed. | 100mL of ON cultures were pelleted. The protocol provided by QIAGEN Plasmid Kit was followed. | ||
==Results== | ==Results== | ||
- | + | <hr/> | |
==Conclusion== | ==Conclusion== | ||
<hr/> | <hr/> |
Revision as of 13:49, 3 September 2013
3 September 2013
Navigate to the Previous or the Next Entry
Contents |
Lab 208
Main purpose
- Biobrick construction -> CycAX and AMO plasmid isolation.
Who was in the lab
Kristian, Julia
Procedure
Midiprep CycAX col.2, AMO col.2
We want a high yield purification. 100mL of ON cultures were pelleted. The protocol provided by QIAGEN Plasmid Kit was followed.
Results
Conclusion
Navigate to the Previous or the Next Entry