Team:SJTU-BioX-Shanghai/DIY/use
From 2013.igem.org
(Difference between revisions)
(Created page with "{{Template:13SJTU_header_new}} {{Template:13SJTU_main_JS}} <table ><td> __NOTOC__ <!----------------------------------------------------从这里开始写wiki-------------------...") |
(→How to assemble the box?) |
||
Line 8: | Line 8: | ||
<br> | <br> | ||
First we need to insert the SCM onto our PCB and check whether it works or not.<br> | First we need to insert the SCM onto our PCB and check whether it works or not.<br> | ||
- | [[File: | + | [[File:13sjtu_assemble1.jpg|600px]][[File:13sjtu_assemble2.jpg|600px]] |
<br><br> | <br><br> | ||
Secondary we should put our PCB into the dark box and plug in.<br> | Secondary we should put our PCB into the dark box and plug in.<br> | ||
- | [[File: | + | [[File:13sjtu_assemble3.jpg|600px]][[File:13sjtu_assemble4.jpg|600px]] |
<br><br> | <br><br> | ||
Then we can put our prepared barrier into dark box(we can see the blue led has already been turned on) and switch in the USB data line. | Then we can put our prepared barrier into dark box(we can see the blue led has already been turned on) and switch in the USB data line. | ||
- | [[File: | + | [[File:13sjtu_assemble5.jpg|600px]][[File:13sjtu_assemble6.jpg|600px]] |
<br><br> | <br><br> | ||
Finally we can input the computer signal we want to the SCM in our dark box. | Finally we can input the computer signal we want to the SCM in our dark box. | ||
- | [[File: | + | [[File:13sjtu_assemble7.jpg|600px]] |
<!----------------------------------------------------到这里结束---------------------------------------> | <!----------------------------------------------------到这里结束---------------------------------------> |
Revision as of 01:22, 29 October 2013