Team:Calgary Entrepreneurial/Project/Manufacturing

From 2013.igem.org

(Difference between revisions)
Line 37: Line 37:
<h3>PATRICK PUT IN FIGURE OF THE MICROFLUIDIC CHIP HERE!!!!!!!</h3>
<h3>PATRICK PUT IN FIGURE OF THE MICROFLUIDIC CHIP HERE!!!!!!!</h3>
 +
<h2>Prototype Development Timeline</h2>
 +
 +
<p>Each round of prototype development will require a series of steps to design and simulate the prototype, design the molding and plastic casings for each device, assemble each component individually, and then integrate the components into the finalized system. An overview of this process and the components that would be required are shown below:</p>
 +
 +
<h3> INSERT PICTURE OF GANTT LIKE CHART SHOWING TIMELINE FOR DEVELOPMENT OVERALL!!!</h3>
<h2>Cost of Production</h2>
<h2>Cost of Production</h2>
-
<p>To produce our final product several rounds of prototype and product development will have to be undergone to ensure the production of an effective product.  It is estimated that our product development will require at least five rounds of prototype development cycles as compared to other similar products in this industry.  Overall we have estimated the cost of these five rounds will be in the range of <b>$200,000 to $250,000</b>.  Breakdown of this analysis is listed below:
+
<p>To produce our final product several rounds of prototype and product development will have to be undergone to ensure the production of an effective product.  It is estimated that our product development will require at least five rounds of prototype development cycles as compared to other similar products in this industry.  Overall we have estimated the cost of these five rounds will be in the range of <b>$200,000 to $250,000</b>.  Breakdown of this analysis is listed below:</p>
<h3> INPUT FIGURE FROM DEVELOPMENT CYCLE COST DOCUMENT</h3>
<h3> INPUT FIGURE FROM DEVELOPMENT CYCLE COST DOCUMENT</h3>
-
<p>Once our finalized product is ready to enter mass production, estimated analysis for the cost of building the device would require an overhead of about $215.00 per unit.  Additionally, producing one of the catridges would be equivalent to $5.80 per cuvette
+
<p>Once our finalized product is ready to enter mass production, estimated analysis for the cost of building the device would require an overhead of about $215.00 per unit.  Additionally, producing one of the catridges would be equivalent to $5.80 per unit.  The information for this analysis is below:</p>
 +
 
 +
<h3> INPUT FIGURE FORM MANUFACTURING COST ESTIMATES</h3>
 +
 
 +
 
<p>Production will be facilitated by partnering with key manufacturing services and operation experts.  One such example of one of these partners would be ACAMP - the Alberta Center for the Advancement of MNT Products.  This government funded organization provides expertise and funding to commercialize products.</p>
<p>Production will be facilitated by partnering with key manufacturing services and operation experts.  One such example of one of these partners would be ACAMP - the Alberta Center for the Advancement of MNT Products.  This government funded organization provides expertise and funding to commercialize products.</p>

Revision as of 05:11, 25 October 2013

FREDsense's website works best with Javascript enabled, especially on mobile devices. Please enable Javascript for optimal viewing.

Manufacturing

Design, Optimization and Regulatory Approval

Manufacturing

Developing Prototypes and Manufacturing Models

With a technology implementation plan in place (please see the technology link for more information) we have developed drawings and plans to be able to optimize our prototype system and prepare it as a product for delivery into the market. Below are schematics of potential forms of our system:

Figure 1: Concept sketch of the cartridge system that will be utilized in the FRED device. The catridge will contain freeze dried bacteria and electroactive chemicals where the sample can be added. A one way valve will ensure containment, and a twist locked bleach capsule will allow for easy disposal of the product.
Figure 2: Conceptual sketch of the device which contains a loading location for the catridge, a heating block to ensure electrodes are functional, and built-in GPS/USB/WiFi capability to send the data to the appropriate server or device.

While these prototypes are the primary manufacturing layouts that have been tested so far, we have also analyzed potential other means of developing prototypes such as microfluidics. An example of a microfluidic chip layout that could be used is seen below. Microfluidics offers a distinct advantage in terms of price per each unit that must be produced. Because it is on a micro-scale, it uses less of each reagent and component making them more simple to handle and effective to use.

PATRICK PUT IN FIGURE OF THE MICROFLUIDIC CHIP HERE!!!!!!!

Prototype Development Timeline

Each round of prototype development will require a series of steps to design and simulate the prototype, design the molding and plastic casings for each device, assemble each component individually, and then integrate the components into the finalized system. An overview of this process and the components that would be required are shown below:

INSERT PICTURE OF GANTT LIKE CHART SHOWING TIMELINE FOR DEVELOPMENT OVERALL!!!

Cost of Production

To produce our final product several rounds of prototype and product development will have to be undergone to ensure the production of an effective product. It is estimated that our product development will require at least five rounds of prototype development cycles as compared to other similar products in this industry. Overall we have estimated the cost of these five rounds will be in the range of $200,000 to $250,000. Breakdown of this analysis is listed below:

INPUT FIGURE FROM DEVELOPMENT CYCLE COST DOCUMENT

Once our finalized product is ready to enter mass production, estimated analysis for the cost of building the device would require an overhead of about $215.00 per unit. Additionally, producing one of the catridges would be equivalent to $5.80 per unit. The information for this analysis is below:

INPUT FIGURE FORM MANUFACTURING COST ESTIMATES

Production will be facilitated by partnering with key manufacturing services and operation experts. One such example of one of these partners would be ACAMP - the Alberta Center for the Advancement of MNT Products. This government funded organization provides expertise and funding to commercialize products.

Production A) How will you accomplish production or conduct service operations? 1) How much will you do internally and by what methods? 2) How much through subcontracts, both initially and after one or two years? B) What production or operating advantages do you have? C) What is your present capacity for level of production or operations? How can this be expanded? D) What are critical parts? Are any of these parts “single- or sole-sourced” or do you have backup vendors? What are the lead times of these parts? E) What are the standard costs for production at different volume levels?

Once we have characterized our sensory element and coupled it to the optimal reporters in our chassis, we will need to create the portable lab.