Team:INSA Toulouse/contenu/lab practice/notebook/calendar/logic gates

From 2013.igem.org

(Difference between revisions)
Line 108: Line 108:
      
      
     <ul class="arrow">
     <ul class="arrow">
-
<li><a href="">June 2013</a>
 
-
  <ul class="circlearrow">
 
-
  <li><a href="">Week Z</a></br>
 
-
blablablablablbalbalablablabal</li>
 
-
  <li><a href="">Week Y</a></br>
 
-
blablablablablablablbalab</li>
 
-
  </ul>
 
-
</li>
 
<li><a href="">July 2013</a>
<li><a href="">July 2013</a>
   <ul class="circlearrow">
   <ul class="circlearrow">
-
   <li><a href="">Week Z</a></li>
+
   <li><span class="spantitle2">Week 6 (15-21 July)</span><br>
-
   <li><a href="">Week Y</a></li>
+
15/07<br>
 +
PCR to invert RFP and rbs.LuxI with the restriction site ClaI BamHI<br><br>
 +
16/07<br>
 +
Purification of the PCR and verification by gel.<br><br>
 +
19/07<br>
 +
Assembling of  rbs.LuxI and cI for the final system with the AND1 gate.<br>
 +
Arrival of the synthesis.<br><br>
 +
20/07<br>
 +
Verification of the clonage.<br>
 +
Assembling the synthesis parts (the 4 gates) into pSB1C3.<br><br>
 +
</li>
 +
   <li><span class="spantitle2">Week 7 (22-28 July)</span><br>
 +
22/07<br>
 +
Assembling XOR1 with FimE, LuxI with cI <br>
 +
</li>
   </ul>
   </ul>
</li>
</li>

Revision as of 09:05, 19 September 2013

logo


Calendar

Logic Gates Characterization

  • July 2013
    • Week 6 (15-21 July)
      15/07
      PCR to invert RFP and rbs.LuxI with the restriction site ClaI BamHI

      16/07
      Purification of the PCR and verification by gel.

      19/07
      Assembling of rbs.LuxI and cI for the final system with the AND1 gate.
      Arrival of the synthesis.

      20/07
      Verification of the clonage.
      Assembling the synthesis parts (the 4 gates) into pSB1C3.

    • Week 7 (22-28 July)
      22/07
      Assembling XOR1 with FimE, LuxI with cI
  • August 2013


Back to Wet Lab