Team:INSA Toulouse/contenu/lab practice/notebook/calendar/logic gates
From 2013.igem.org
(Difference between revisions)
Mesnageclem (Talk | contribs) |
Mesnageclem (Talk | contribs) |
||
Line 108: | Line 108: | ||
<ul class="arrow"> | <ul class="arrow"> | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
<li><a href="">July 2013</a> | <li><a href="">July 2013</a> | ||
<ul class="circlearrow"> | <ul class="circlearrow"> | ||
- | <li>< | + | <li><span class="spantitle2">Week 6 (15-21 July)</span><br> |
- | <li>< | + | 15/07<br> |
+ | PCR to invert RFP and rbs.LuxI with the restriction site ClaI BamHI<br><br> | ||
+ | 16/07<br> | ||
+ | Purification of the PCR and verification by gel.<br><br> | ||
+ | 19/07<br> | ||
+ | Assembling of rbs.LuxI and cI for the final system with the AND1 gate.<br> | ||
+ | Arrival of the synthesis.<br><br> | ||
+ | 20/07<br> | ||
+ | Verification of the clonage.<br> | ||
+ | Assembling the synthesis parts (the 4 gates) into pSB1C3.<br><br> | ||
+ | </li> | ||
+ | <li><span class="spantitle2">Week 7 (22-28 July)</span><br> | ||
+ | 22/07<br> | ||
+ | Assembling XOR1 with FimE, LuxI with cI <br> | ||
+ | </li> | ||
</ul> | </ul> | ||
</li> | </li> |
Revision as of 09:05, 19 September 2013
Calendar
Logic Gates Characterization
- July 2013
- Week 6 (15-21 July)
15/07
PCR to invert RFP and rbs.LuxI with the restriction site ClaI BamHI
16/07
Purification of the PCR and verification by gel.
19/07
Assembling of rbs.LuxI and cI for the final system with the AND1 gate.
Arrival of the synthesis.
20/07
Verification of the clonage.
Assembling the synthesis parts (the 4 gates) into pSB1C3.
- Week 7 (22-28 July)
22/07
Assembling XOR1 with FimE, LuxI with cI
- Week 6 (15-21 July)
- August 2013