Team:BYU Provo/Notebook/Cholera - Enzymes/September-October

From 2013.igem.org

(Difference between revisions)
Line 36: Line 36:
<br>  
<br>  
-
<font size="3" font face="Calibri"> Insert Text </font>
+
<font size="3" font face="Calibri"> We successfully prepared the DspB and AmyA plasmids to submit to the iGem registry and those to be used in our protein purification. We then were able to purify DspB and AmyA to use in our biofilm assay. </font>
<br>
<br>
Line 58: Line 58:
<br>  
<br>  
-
<font size="3" font face="Calibri"> Insert Text</font>
+
<font size="3" font face="Calibri"> We focused on running our biofilm assay and getting data on the degradative enzymatic activity of the DspB and AmyA proteins we have purified.</font>
<br>
<br>

Revision as of 01:52, 25 September 2013


Cholera - Enzyme Notebook September



Cholera Detection
March-April
May-June
July-August
September

September 1 - September 14


We successfully prepared the DspB and AmyA plasmids to submit to the iGem registry and those to be used in our protein purification. We then were able to purify DspB and AmyA to use in our biofilm assay.


Daily log


BYUCEFall1.JPG
September 15 - September 27


We focused on running our biofilm assay and getting data on the degradative enzymatic activity of the DspB and AmyA proteins we have purified.


Daily log




Winter2.JPG