Team:BYU Provo/Notebook/Cholera - Enzymes/September-October
From 2013.igem.org
(Difference between revisions)
Sabinater09 (Talk | contribs) |
Sabinater09 (Talk | contribs) |
||
Line 56: | Line 56: | ||
| style="width: 18%; background-color: transparent;"| | | style="width: 18%; background-color: transparent;"| | ||
- | | <font size="5" font face="Calibri"> '''September 15 - September | + | | <font size="5" font face="Calibri"> '''September 15 - September 30''' </font> |
<br> | <br> |
Revision as of 18:05, 14 October 2013
| ||
|
September 1 - September 14
We successfully prepared the DspB and AmyA plasmids to submit to the iGem registry and those to be used in our protein purification. We then were able to purify DspB and AmyA to use in our biofilm assay.
| |
September 15 - September 30
We focused on running our biofilm assay and getting data on the degradative enzymatic activity of the DspB and AmyA proteins we have purified.
|
|