Team:INSA Toulouse/contenu/lab practice/notebook/calendar/recomb

From 2013.igem.org

(Difference between revisions)
Line 152: Line 152:
<div class="clear"></div>
<div class="clear"></div>
<p class="texte">  
<p class="texte">  
-
<img src="https://static.igem.org/mediawiki/2013/3/3a/Back_arrow_-_14px.png" class="imgcontent" />
+
<img src="https://static.igem.org/mediawiki/2013/3/3a/Back_arrow_-_14px.png"/><a href="https://2013.igem.org/Team:INSA_Toulouse/contenu/lab_practice/notebook/calendar/wet_lab">Back to Wet Lab</a></p>
-
<a href="https://2013.igem.org/Team:INSA_Toulouse/contenu/lab_practice/notebook/calendar/wet_lab">Back to Wet Lab</a></p>
+
</div>
</div>

Revision as of 13:39, 18 September 2013

logo


Calendar

Riboregulators & Logic gates

  • July 2013
    • Week 6 (15-21 July)
      15/07
      Assembling Bxb1 with terminator by 3A assembling into pSB1A3
      Assembling FimE recombinase with rbs by 3A assembling into pSB1C3
      Mutagenese of PhiC31 from the Suiti Parts (A24) to delete the EcoRI restriction site
      PCR to extract Tp901.1 from the Bonnet parts
      PCR to invert RFP and rbs.LuxI with the restriction site ClaI BamHI

      16/07
      Purification of the PCR and verification by gel.
      Miniprep for the verification of the clonage, Bxb1.term and rbs.FimE.
      For the mutagenese of PhiC31, restriction by DpnI and transformation.

      17/07
      Assembling Tp901.1 with terminator by 3A assembling.
      PCR of extraction of the vector A24 with Phic31 mutated.

      18/07
      Assembling PhiC31 mutated with the terminator into pSB1C3.

      19/07
      Assembling of rbs.LuxI and cI for the final system with the AND1 gate.
      Assembling of rbs.FimE with terminator into pSB1C3.
      Arrival of the synthesis.

      20/07
      Verification of the clonage.
      Assembling the synthesis parts (the 4 gates and the 6 riboregulators) into pSB1C3.

    • Week 7 (22-28 July)
      22/07
      Assembling XOR1 with PhiC31*, LuxI with cI and the riboregulator 1, 4, 5...
  • August 2013
    • Week ...
    • Week ...

Back to Wet Lab