Team:INSA Toulouse/contenu/lab practice/notebook/calendar/logic gates
From 2013.igem.org
Revision as of 09:05, 19 September 2013 by Mesnageclem (Talk | contribs)
Calendar
Logic Gates Characterization
- July 2013
- Week 6 (15-21 July)
15/07
PCR to invert RFP and rbs.LuxI with the restriction site ClaI BamHI
16/07
Purification of the PCR and verification by gel.
19/07
Assembling of rbs.LuxI and cI for the final system with the AND1 gate.
Arrival of the synthesis.
20/07
Verification of the clonage.
Assembling the synthesis parts (the 4 gates) into pSB1C3.
- Week 7 (22-28 July)
22/07
Assembling XOR1 with FimE, LuxI with cI
- Week 6 (15-21 July)
- August 2013