Team:INSA Toulouse/contenu/lab practice/notebook/calendar/logic gates

From 2013.igem.org

Revision as of 11:49, 27 September 2013 by Antoine (Talk | contribs)

logo


Calendar

Logic Gates Characterization

July 2013

  • Week 6 (15-21 July)
    15/07
    PCR to invert RFP and rbs.LuxI with the restriction site ClaI BamHI

    16/07
    Purification of the PCR and verification by gel.

    19/07
    Assembling of rbs.LuxI and cI for the final system with the AND1 gate.
    Arrival of the synthesis.

    20/07
    Verification of the clonage.
    Assembling the synthesis parts (the 4 gates) into pSB1C3.

  • Week 7 (22-28 July)
    22/07
    Assembling XOR1 with FimE, LuxI with cI

August 2013



Back to Wet Lab