Team:Evry/Protocols/02

From 2013.igem.org

Revision as of 09:56, 2 September 2013 by Batou (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Iron coli project

Transformation

Goal

In this step,

à modif

the heat shock (between -80°C up to 42°C) induces chimiocompetent bacteria to be in state of competence. DNA from the environment (in this case: plasmid) can then integrate the cell.

Preparation

Chimiocompetent cells

For 100 µL of chemical competent cells, add 1 µL of plasmidic DNA. If the ligation protocol is a Golden Gate , add 5 µL instead.
Let 30 minutes on ice.
Let the cells at 42°C for exactly 50 seconds.
Let 5 minutes on ice.
Resuspend the cells with 1 mL of LB spread on a petri dish then let it at 37°C.

Electrocompetent cells

Controles

To check if the transformation have work, make a positive and a negative controle.

  • Positive controle: Use plasmid pSB1A3
    If the transformation have worked, colonies must have a red phenotype.

  • Negative controle: Ø
    Without plasmid with antibiotic resistance, no colonies must grow.