Team:Calgary/Outreach/GenomeAlberta

From 2013.igem.org

(Difference between revisions)
Line 13: Line 13:
<br>
<br>
-
<a href="http://genomealberta.ca/blogs/heavy-lifting-of-biobricks-underway-for-the-u-of-c-igem-team.aspx"><span class="Orange"><b>Part 2: Introducing iGEM Calgary</b></span></a>
+
<a href="http://genomealberta.ca/blogs/heavy-lifting-of-biobricks-underway-for-the-u-of-c-igem-team.aspx"><span class="Orange"><b>Part 2: Heavy Lifting of biobrick Underway for the U of C iGEM Team</b></span></a>
<br>
<br>
-
Part 3
+
<a href="http://genomealberta.ca/blogs/from-lab-to-feedlot-with-igem-calgary.aspx"><span class="Orange"><b>Part 3: Heavy Lifting of biobrick Underway for the U of C iGEM Team</b></span></a>
-
http://genomealberta.ca/blogs/from-lab-to-feedlot-with-igem-calgary.aspx
+
 
<br>
<br>
Ill make the links look pretty later
Ill make the links look pretty later

Revision as of 06:20, 27 September 2013

Genome Alberta

As another continuation of last year’s work, we continued to write blogs for one of our sponsors, Genome Alberta. Genome Alberta has been extremely supportive of our iGEM team over the years and it was a great opportunity to continue to This allowed us to share the story of our iGEM experience and what we learned with a much larger audience. Read our series of blog posts by following the links below:


Part 1: Introducing iGEM Calgary
Part 2: Heavy Lifting of biobrick Underway for the U of C iGEM Team
Part 3: Heavy Lifting of biobrick Underway for the U of C iGEM Team
Ill make the links look pretty later