Team:INSA Toulouse/contenu/lab practice/notebook/calendar/dry lab

From 2013.igem.org

Revision as of 12:18, 27 September 2013 by Antoine (Talk | contribs)

logo


Notebook

Dry Lab Calendar

June 2013

  • Week 1 (10-16 June)
    During this week litterature searches about biological logic gates and protocols were performed.
    We also began to plan the lab work for the following weeks. We started to take an inventory of necessary biobricks already available in plates supplied by the MIT and to mail former iGEM teams to receive the others.
    Project complet scheme elaboration with all the needeed biobricks.
  • Week 2 (17-23 June)
    We wondered about the use of another strain DH5-1, with a faster growth and so a reduction of waiting times. Reflexions were also performed about the integration strategy of our system in the bacterial host E. coli.
    In parallel, we finalized the final global diagram of our system and intermediate constructions for characterizations (light sensors, carry diffusion (AHL) and general inducer (atC)). These ones have been divided up between team members to start first clonings.
    New search and amplification of biobricks with rbs and terminators if possible.
  • Week 3 (24-30 June)
    Design of sequences to synthesize in order to save time : logic gates and our riboswitch regulation system in biobrick format.
    A new idea for logic gates design came up : recombinases can turn terminators over , instead of genes themselves. So we had to find adapted terminators in the registry part, that is to say very efficient ones in both ways of transcription.
    As far as the integration in concerned, reflexion keeps going. The final host can not have more than two plasmids, with two different markers and origins of replication. AND1/AND2 gates should be on a first plasmid and XOR1/XOR2 on an other to reduce recombination problems. Moreover a part of our system has to be integrated in the host’s genome. We did a research about this topic to understand how integrative vectors work. We asked the UNIPV Pavia Team (2010) about their integrative vector for E. coli. Yet, a pir+ strain is needed to make it works... Search has to be continued...

July 2013

  • Week 4 (1-7 July)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings
  • Week 5 (8-14 July)
    Modeling
    Website / Logo
    Ethics
    Conferences / meetings : Meeting with Mr Cornet about the integration strategy.
  • Week 6 (15-21 July)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings
  • Week 7 (22-28 July)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings

August 2013

  • Week 8 (29-4 August)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings
  • Week 9 (5-11 August)
    Modeling
    Website / Logo: Wiki ready to be completed
    Ethics
    Conferences and meetings
  • Week 10 (12-18 August)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings
  • Week 11 (19-25 August)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings
  • Week 12 (26-31 August)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings

September 2013

  • Week 13 (1-8 September)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings
  • Week 14 (9-15 September)
    Modeling
    Website / Logo: Wiki ready to be completed
    Ethics
    Conferences and meetings
  • Week 15 (16-22 September)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings: presentation of the project and the summer's achievements to the LISBP.
  • Week 16 (23-29 September)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings

October 2013

  • Week 17 (30-6 October)
    Modeling
    Website / Logo
    Ethics
    Conferences and meetings
  • Week 18 (7-13 October)
    Modeling
    Website / Logo: Wiki ready to be completed
    Ethics
    Conferences and meetings