Team:Paris Saclay/Notebook/July/10

From 2013.igem.org

(Difference between revisions)
(Summary:)
(Summary:)
Line 7: Line 7:
For regulation system:
For regulation system:
-
*prepared the solution of BioBrick fnr repressor in PsB1C3 plasmid for DNA sequencing
+
*prepared the solution of BioBrick fnr repressor in PsB1C3 plasmid for DNA sequencing.
-
*the terminator transformation of yesterday did not work, a second transformation had
+
*the terminator transformation of yesterday did not work, a second transformation had been done for it.
-
been done for it
+
*The transformation for RBS+LacZ+terminator plasmid into competent cells was performed.
-
*The transformation for RBS+LacZ+terminator plasmid into competent cells was
+
*after the transformation PSB3K3 plasmid in competent cells, these cells were cultured in a liquid nutritive medium.
-
performed.
+
 
-
*after the transformation PSB3K3 plasmid in competent cells, these cells were cultured in a
+
-
liquid nutritive medium
+
<br>
<br>
For PSBs sensor system:
For PSBs sensor system:
*the ligation products were transformed into competent cells and were cultured on solid
*the ligation products were transformed into competent cells and were cultured on solid
-
medium with their specific antibiotics
+
medium with their specific antibiotics.
=='''Lab work'''==
=='''Lab work'''==

Revision as of 03:02, 28 August 2013

Notebook : July 10

Summary:

For regulation system:

  • prepared the solution of BioBrick fnr repressor in PsB1C3 plasmid for DNA sequencing.
  • the terminator transformation of yesterday did not work, a second transformation had been done for it.
  • The transformation for RBS+LacZ+terminator plasmid into competent cells was performed.
  • after the transformation PSB3K3 plasmid in competent cells, these cells were cultured in a liquid nutritive medium.


For PSBs sensor system:

  • the ligation products were transformed into competent cells and were cultured on solid

medium with their specific antibiotics.

Lab work

constructing



Previous day Back to calendar Next day