Team:NTU-Taida/Notebook/Journal

From 2013.igem.org

(Difference between revisions)
(7/3)
(Check)
Line 43: Line 43:
===Check ===
===Check ===
-
#Positive feedback circuit:  Pc-A-C-B, Pc-A-C-E, Pc-A-C-B, Pc-D-F-B, Pc-D-F-E, Pc-D-F-G;
+
#Positive feedback circuit:   
-
#Control:  PLas-B, PLas-E, PLas-G, PRhl-B, PRhl-E, PRhl-G;
+
Pc-A-C-B, Pc-A-C-E, Pc-A-C-B, Pc-D-F-B, Pc-D-F-E, Pc-D-F-G;
 +
#Control:   
 +
PLas-B, PLas-E, PLas-G, PRhl-B, PRhl-E, PRhl-G;
(A: RBS-RhlR-tt C: PRhl-RBS-RhlR D: RBS-LasR-tt F: PLas-RBS-LasR B: RBS-mCherry-tt E: RBS-GFPmut-tt G: RBS-mRFP-tt )
(A: RBS-RhlR-tt C: PRhl-RBS-RhlR D: RBS-LasR-tt F: PLas-RBS-LasR B: RBS-mCherry-tt E: RBS-GFPmut-tt G: RBS-mRFP-tt )

Revision as of 17:17, 2 September 2013

Journal

July
Sun. Mon. Tue. Wed. Thu. Fri. Sat.
01 02 03 04 05 06
07 08 09 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31

Contents

July

7/1~7/5

Finish RhlR and LasR circuit.

7/1

Transform:

  1. Positive feedback circuit:
    Pc-A-C-B, Pc-A-C-E, Pc-A-C-B, Pc-D-F-B, Pc-D-F-E, Pc-D-F-G;
  2. Control:
    PLas-B, PLas-E, PLas-G, PRhl-B, PRhl-E, PRhl-G;
  3. (A: RBS-RhlR-tt C: PRhl-RBS-RhlR D: RBS-LasR-tt F: PLas-RBS-LasR B: RBS-mCherry-tt E: RBS-GFPmut-tt G: RBS-mRFP-tt )
  4. New:
    Pcin, CinR (resistant=C)

7/2

Result:

There’s no colonies at plates of Pcin and CinR.

Transform:

Pcin(resistant=A), CinR (resistant=K)

Inoculation and incubation at LB broth

  1. Positive feedback circuit:
  2. Pc-A-C-B, Pc-A-C-E, Pc-A-C-B, Pc-D-F-B, Pc-D-F-E, Pc-D-F-G;
  3. Control:
  4. PLas-B, PLas-E, PLas-G, PRhl-B, PRhl-E, PRhl-G; (A: RBS-RhlR-tt C: PRhl-RBS-RhlR D: RBS-LasR-tt F: PLas-RBS-LasR B: RBS-mCherry-tt E: RBS-GFPmut-tt G: RBS-mRFP-tt )

7/3

Inoculation and incubation at LB broth

Pcin(resistant=A), CinR (resistant=K)

Check

  1. Positive feedback circuit:

Pc-A-C-B, Pc-A-C-E, Pc-A-C-B, Pc-D-F-B, Pc-D-F-E, Pc-D-F-G;

  1. Control:

PLas-B, PLas-E, PLas-G, PRhl-B, PRhl-E, PRhl-G; (A: RBS-RhlR-tt C: PRhl-RBS-RhlR D: RBS-LasR-tt F: PLas-RBS-LasR B: RBS-mCherry-tt E: RBS-GFPmut-tt G: RBS-mRFP-tt )

7/4

7/5

7/8~7/12

7/8

7/9

7/10

7/11

7/12

7/15~7/19

7/15

7/16

7/17

7/18

7/19

7/22~7/31

7/22

7/23

7/24

7/25

7/26

7/27

7/28

7/29

7/30

7/31

July

2